Box Assemblies

21 BAG BOX ASSEMBLY

21BAG INCLUDES:

  • 2 x 2100mm x 100nb Posts
  • 2 x 100nb Post Caps
  • 1 x 2160mm x 50nb Top Rail
  • 2 x Nut & Bolt
  • 1 x Wire Rope Brace Kit

Hinges to suit available

Hot Dip Galvanised after fabrication

INSTALLATION: It´s as simple as this…

  1. Concrete in posts
  2. Attach top rail and wire rope to posts
  3. Place caps on posts
  4. Tension wire rope after concrete has cured and strain fence

21 BASG BOX ASSEMBLY WITH STAY

21BASG INCLUDES:

  • 2 x 2100mm x 100nb Posts
  • 2 x 100nb Post Caps
  • 1 x 2160mm x 50nb Top Rail
  • 1 x 3250mm x 50nb Stay
  • 2 x Nut & Bolt
  • 1 x Wire Rope Brace Kit

Hinges to suit available

Hot Dip Galvanised after fabrication

INSTALLATION: It´s as simple as this…

  1. Concrete in posts
  2. Attach top rail and wire rope to posts
  3. Place caps on posts
  4. Tension wire rope after concrete has cured and strain fence

21 D BAG DRIVEABLE BOX ASSEMBLY

21DBAG INCLUDES:

  • 2 x 2100mm x 100nb/75×75 Driveable Post
  • 2 x 100nb Post Caps
  • 1 x 2160mm x 50nb Top Rail
  • 2 x Nut & Bolt
  • 1 x Wire Rope Brace Kit

Hinges to suit available

Hot Dip Galvanised after fabrication

INSTALLATION: It´s as simple as this…

  1. Drive in posts
  2. Hammer steel pickets through keepers provided
  3. Attach top rail and wire rope to posts
  4. Place caps on posts
  5. Tension wire rope and strain fence.

21 DBAFPSG DRIVEABLE BOX ASSEMBLY WITH FOOTPLATE STAY

21DBAFPSG INCLUDES:

  • 2 x 2100mm x 100nb/75×75 Driveable Post
  • 2 x 100nb Post Caps
  • 1 x 2160mm x 50nb Top Rail
  • 1 x 3250mm x 50nb Stay
  • 1 x 480mm x 400mm x 3mm Footplate
  • 4 x Nut & Bolt
  • 1 x Threaded Rod & Washers
  • 1 x Wire Rope Brace Kit

Hinges to suit available

Hot Dip Galvanised after fabrication

INSTALLATION: It´s as simple as this…

  1. Drive in posts
  2. Hammer steel pickets through keepers provided
  3. Attach stay, top rail and wire rope to posts
  4. Attach footplate to stay
  5. Thread rod through post and footplate.
  6. Place footplate on soil and tension rod to increase down pressure on footplate
  7. Place caps on posts
  8. Tension wire rope and strain fence.

21 DBADSG DRIVEABLE BOX WITH DRIVEABLE STAY

21DBADSG INCLUDES:

  • 2 x 2100mm x 100nb/75×75 Driveable Posts
  • 2 x 100nb Post Caps
  • 1 x 2160mm x 50nb Top Rail
  • 1 x 3250mm x 50nb Stay
  • 1 x 400mm x 200mm Driveable Stay Bloc
  • 4 x Nut & Bolt
  • 1 x Wire Rope Brace Kit

Hinges to suit available

Hot Dip Galvanised after fabrication

INSTALLATION: It´s as simple as this…

  1. Drive in posts
  2. Hammer steel pickets through keepers provided
  3. Attach stay, top rail and wire rope to posts
  4. Attach stay block to stay
  5. Place stay block in correct positon and hammer into ground, removing soil under stay to enable stay block to be completely buried.
  6. Place caps on posts
  7. Tension wire rope and strain fence.

Visit Box Assembly Gallery

Copyright © 2011 Quikfence Fences & Gates