Corner Assemblies

CA90G CORNER ASSEMBLY

CA90G INCLUDES:

  • 1 x 2100mm x 100nb Post
  • 1 x 100nb Post Cap
  • 1 x 3250mm x 50nb Stay
  • 1 x Nut & Bolt

Hinges to suit available

Hot Dip Galvanised after fabrication

INSTALLATION: It´s as simple as this…

  1. Concrete in post
  2. Attach stays to post
  3. Concrete in stays
  4. Concrete in stays
  5. Concrete in stays

FPCA90G FOOTPLATE CORNER ASSEMBLY

FPCA90G INCLUDES:

  • 1 x 2100mm x 100nb Post
  • 1 x 100nb Post Cap
  • 2 x 3250mm x 50nb Stays
  • 2 x 480mm x 400mm x 3mm Footplates
  • 2 x Threaded Rod, Nut, Bolt and Washer

Hinges to suit available

Hot Dip Galvanised after fabrication

INSTALLATION: It´s as simple as this…

  1. Concrete/drive in post
  2. Attach stays to post
  3. Attach footplates to stays
  4. Thread rod through post and footplates
  5. Place footplates on soil and tension rod to increase down pressure on footplate
  6. Place cap on post
  7. Allow to cure before tying wires if using concrete.

DFPCA90G DRIVEABLE FOOTPLATE CORNER ASSEMBLY

DFPCA90G INCLUDES:

  • 1 x 2100mm x 100nb/75X75 Driveable Post
  • 1 x 100nb Post Cap
  • 1 x 3250mm x 50nb Stays/li>
  • 1 x 480mm x 400mm x 3mm Footplates
  • 1 x Threaded Rod, Nut, Bolt and Washer

Hinges to suit available

Hot Dip Galvanised after fabrication

INSTALLATION: It´s as simple as this…

  1. Drive in post
  2. Hammer steel pickets through keepers provided
  3. Attach stays to post
  4. Attach footplates to stays
  5. Thread rod through post and footplates
  6. Place footplates on soil and tension rod to increase down pressure on footplates
  7. Place cap on post

DCA90G:DS DRIVEABLE CORNER ASSEMBLY WITH DRIVEABLE STAY

DCA90G:DS INCLUDES:

  • 1 x 2100mm x 100nb/75×75 Driveable Post
  • 1 x 100nb Post Cap
  • 1 x 3250mm x 50nb Stays/li>
  • 1 x 400mm x 200mm Driveable Stay Blocks
  • 4 x Nut & Bolt

Hinges to suit available

Hot Dip Galvanised after fabrication

INSTALLATION: It´s as simple as this…

  1. Drive in post
  2. Hammer steel pickets through keepers provided
  3. Attach stays to post
  4. Attach footplates to stays
  5. Thread rod through post and footplates
  6. Place footplates on soil and tension rod to increase down pressure on footplates
  7. Place cap on post

CAQS CORNER ASSEMBLY QUIKSTAY

  • Ideal for electric fencing around dams, sheds, laneways, roadsides, crops and strip grazing.

Hinges to suit available

Hot Dip Galvanised after fabrication

INSTALLATION: It´s as simple as this…

  1. Position the quikstay drive in the steel picket through the main tube with the corner attachment placed over the main tube, under the fixed stay
  2. Drive in the short steel pickets through the stay ends

View other quikstay options

Visit Corner Assembly Gallery

Copyright © 2011 Quikfence Fences & Gates