End Assemblies

EAG END ASSEMBLY

Eag Includes :

  • 1 x 2100mm x 100nb Post
  • 1 x 100nb Post Cap
  • 1 x 3250mm x 50nb Stay
  • 1 x Nut & Bolt

Hinges to suit available

Hot Dip Galvanised after fabrication

FPEAG Footplate & Assembly

FPEAG INCLUDES:

  • 1 x 2100mm x 100nb Post
  • 1 x 100nb Post Cap
  • 1 x 3250mm x 50nb Stay
  • 1 x 480mm x 400mm x 3mm Footplate
  • 1 x Threaded Rod, Nut, Bolt & Washer

Hinges to suit available

Hot Dip Galvanised after fabrication

INSTALLATION: It´s as simple as this…

  1. Concrete/drive in post
  2. Attach stay to post
  3. Attach footplate to stay
  4. Thread rod through post and footplate
  5. Place footplate on soil and tension rod to increase down pressure on footplate
  6. Place cap on post
  7. Allow to cure before tying wires if using concrete.

DFPEAG DRIVEABLE FOOTPLATE END ASSEMBLY

DFPEAG INCLUDES :

  • 1 x 2100mm x 100nb/75×75 Driveable Post
  • 1 x 100nb Post Cap
  • 1 x 3250mm x 50nb Stay
  • 1 x 480mm x 400mm x 3mm Footplate
  • 1 x Threaded Rod, Nut, Bolt & Washer

Hinges to suit available

Hot Dip Galvanised after fabrication

INSTALLATION: It´s as simple as this…

  1. Drive in post
  2. Hammer steel pickets through keepers provided
  3. Attach stay to post
  4. Attach footplate to stay
  5. Thread rod through post and footplate
  6. Place footplate on soil and tension rod to increase down pressure on footplate
  7. Place cap on post

DEAG:DS DRIVEABLE END ASSEMBLY WITH DRIVEABLE STAY

DEAG:DS INCLUDES:

  • 1 x 2100mm x 100nb/75×75 Driveable Post
  • 1 x 100nb Post Cap
  • 1 x 3250mm x 50nb Stay
  • 1 x 400mm x 200mm Driveable Stay Block
  • 2 x Nut & Bolt

Hinges to suit available

Hot Dip Galvanised after fabrication

INSTALLATION: It´s as simple as this…

  1. Drive in post
  2. Hammer steel pickets through keepers provided
  3. Attach stay to post
  4. Attach stay to post
  5. Thread rod through post and footplate
  6. lace stay block in correct position and hammer into ground, removing soil under stay to enable stay block to be completely buried
  7. Place cap on post

EAQS END ASSEMBLY QUIKSTAY

  • Ideal for electric fencing around dams, sheds, laneways, roadsides, crops and strip grazing.

Hinges to suit available

INSTALLATION: It´s as simple as this…

  1. Position the quikstay drive in the steel picket through the main tube
  2. Drive in the short steel picket through the stay end

View other quikstay options

Visit End Assembly Gallery

Copyright © 2011 Quikfence Fences & Gates